.245
aKajian kinerja jetty di muara Glayem Indramayu (Studi kasus).
hTugas Akhir Thesis-ITB
.100
aTHOMAS Kamper
.005
a20100701100316
.260
aBandung: Program Pendidikan MP-PSDA Dept. Teknik Sipil PPS-ITB, 2002.
b
c2002
.084
aT 627.24 THO
.300
aAneka lemb.
b gamb., tab., 21 cm.
cAneka lemb.; gamb., tab., 21 cm.
.336
aTugas Akhir Thesis-ITB