.245 | |
a | Transmisi gelombang pada konstruksi pemecah gelombang rubble mound. |
h | Tugas Akhir Thesis-ITB |
.100 | |
a | SAR, Mas'ud |
.005 | |
a | 20080922132442 |
.260 | |
a | Bandung |
b | (Jurusan Teknik Sipil) PPS-ITB |
c | 1991 |
.084 | |
a | 624. 17 SAR |
.300 | |
a | iv, aneka lemb.: gamb., 30 cm. |
b | iv, aneka lemb. |
c | iv, aneka lemb.: gamb., 30 cm. |
.336 | |
a | Tugas Akhir Thesis-ITB |