.245 | |
a | Perhitungan kestabilan lubang bukaan pada terowongan headrace PLTA Singkarak menggunakan analisis balik. |
h | Book |
.100 | |
a | Setyawan Rudy |
.005 | |
a | 00000000000000 |
.260 | |
a | Bandung: Program Studi Teknik Sipil PPS-ITB, 1997. |
b | |
c | 2000 |
.084 | |
a | T 669.961 42 Arw |
.300 | |
a | xiii, 117 lemb. |
b | gamb., tab., 30 cm. |
c | xiii, 117 lemb.; gamb., tab., 30 cm. |
.336 | |
a | Book |