.245 | |
a | DAUR ULANG AIR BUANGAN DOMESTIK (GREY WATER) HOTEL MENGGUNAKAN ELEKTROKOAGULASI PASANGAN ELEKTRODA ALUMINIUM |
h | Tugas Akhir Thesis-ITB |
.100 | |
a | NUR, Ansiha |
.005 | |
a | 20211103144054 |
.260 | |
a | Bandung |
b | Prodi Teknik Lingkungan-ITB |
c | 2014 |
.041 | |
a | Indonesia |
.084 | |
a | T/628.3/ NUR d |
.300 | |
a | xv , 91 hal., gamb,grafik, foto,lamp, tabel. 30 cm |
b | xv , 91 hal., gamb,grafik, foto,lamp, tabel. 30 cm |
c | xv , 91 hal., gamb,grafik, foto,lamp, tabel. 30 cm |
.336 | |
a | Tugas Akhir Thesis-ITB |